Ventairge & Innovate UK

Development of low carbon heating & cooling system with storage for public and commercial building

EGB Engineering delivers precision engineering solutions, supporting complex projects with reliability, expertise, and technical excellence.

Ventairge & Innovate UK

Challenge

The Covid-19 global pandemic increased demand for cooling in patient critical hospital wards, as admissions increased during the early stages of the outbreak. It is also set to increase the heating demand in the winter months to come. According to the BEIS (2019), heat is the largest energy-consuming sector in the UK at 44% and the single largest contributor to UK emissions. With regard to cooling, UK demand is dominated by offices (65%) and retailers (30%). Air conditioners are expected to become widespread in the future due to expected rising temperatures. The cooling and heating demand of hospitals and retail spaces must be met by a renewable low-carbon solution such integrated with energy storage in order to reach net zero by 2050. This has given rise to a UK Thermal Energy Storage (TES) market of approximately 20GWh per year until 2050 (BEIS, 2019), which has a value of £800 million per year. This creates the need for a sustainable, renewable and efficient heating and cooling energy storage system with optimised controls for public health buildings and retail spaces.

Ventairge & Innovate UK

Solution

The solution proposed is a low-carbon renewable heating and cooling system that utilises solar technology, combined with a sustainably highly compact storage module. The solution provides thermal energy storage for cooling of buildings in the summer, and heating in the winter. The critical components of the system are powered by solar technology. The power is renewable and the storage module is made from sustainable materials. The system also includes a control system utilising Artificial Intelligence (AI) technology, which efficiently regulates the ambient temperature. It uses Machine Learning (ML) for forecasting and predicting energy demands.

Ventairge & Innovate UK

Results

The development of the heating and cooling system design

Creation and structural design of the storage model

Generous PTO programs for all employees, with an annual cash-out option.

Formulation of the control system

Optimisation of the system and control models

Manufacturability study/assessments

Qualification planning; Market assessment.

Laboratory testing was conducted on the solar technology and storage, which provided key data that was useful for the confirmation of operation and functionality of the modelled system

Join our team

Join our team and contribute to engineering solutions that power critical applications and industries.

Sign up for updates

By subscribing you agree to our Privacy Policy and provide consent to receive updates from EGB.

Join our team

Join our team and contribute to engineering solutions that power critical applications and industries.

Sign up for updates

By subscribing you agree to our Privacy Policy and provide consent to receive updates from EGB.

Join our team

Join our team and contribute to engineering solutions that power critical applications and industries.

Sign up for updates

By subscribing you agree to our Privacy Policy and provide consent to receive updates from EGB.

28 Beaumont Avenue
Southwell
NG25 0BB
United Kingdom

info@egb-eng.com

© 2026 EGB Engineering. All rights reserved.

28 Beaumont Avenue
Southwell
NG25 0BB
United Kingdom

info@egb-eng.com

© 2026 EGB Engineering. All rights reserved.

28 Beaumont Avenue
Southwell
NG25 0BB
United Kingdom

info@egb-eng.com

© 2026 EGB Engineering. All rights reserved.

Privacy Policy

Terms of Use

SECTORS

Aerospace

Energy

Nuclear

Marine

Defence

ABOUT US

Publications

Projects

Accreditations

Carbon Reduction Plan

Case Studies